2 hrs = 2/3
Dec. 19th, 2008 06:42 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
two hours of shoveling and I got 2/3 of the driveway cleared. (not counting the side pad which is not getting done).
At the base of the driveway where the plow had tossed crud, the snow was up to my knees. Up near the house it was about 6 inches.
I had to stop shoveling because the wind was actually cutting through the snowmobile suit I was wearing and I was starting to have trouble with the whole breathing thing.
I'll get up early and finish the driveway. I have a 9:15am nail appointment and then have to run some errands before my sister arrives from DC.
So this evening found me yet again cursing myself for breaking the garage door and thus eliminating the possibility of either snow plow service or buying a snowblower of my own. (well one that works anyway).
~~
~~
~~
~~
~~
~~
At the base of the driveway where the plow had tossed crud, the snow was up to my knees. Up near the house it was about 6 inches.
I had to stop shoveling because the wind was actually cutting through the snowmobile suit I was wearing and I was starting to have trouble with the whole breathing thing.
I'll get up early and finish the driveway. I have a 9:15am nail appointment and then have to run some errands before my sister arrives from DC.
So this evening found me yet again cursing myself for breaking the garage door and thus eliminating the possibility of either snow plow service or buying a snowblower of my own. (well one that works anyway).







(no subject)
Date: 2008-12-20 12:02 am (UTC)